Safety Management

Your Z10 resource map.

Connect the learning and tools you already use to an occupational health and safety management system aligned with ANSI/ASSP Z10.

Start with the resource map. Find what supports each part of the system, see what is available, and plan the work still needed.

Now available: the website resource map. Organization profiles, saved employer evidence, online programs and clause-group Safety Management self-assessments are part of the paid Safety Management workspace. The resource map is free without sign-up. Open paid Safety Management workspace → Existing course accounts continue to save learning records. This page does not score an employer’s system.

Learn · Build · Operate · Evaluate · Improve

See where each resource belongs.

A course can teach a method. A worksheet can help you use it. Your organization still needs to put the arrangements into practice and keep evidence that they work.

551available resources and learning entries56course and pathway entries · Not open for enrollment7Z10 system areas

Counts include individual modules and resource collections. “Available” includes the released Learning Teams module; it does not mean its full course is complete. Counts measure content, not requirement coverage.

Z10 Alignment

4 · Context

Define your work, people and scope.

System work still needed: Organization profile, interested parties and documented scope.

Explore 11 supporting entries →

Z10 Alignment

5 · Leadership & Worker Participation

Make commitments and involve the people doing the work.

System work still needed: Safety policy, accountability, resources and worker-participation arrangements.

Explore 256 supporting entries →

Z10 Alignment

6 · Planning

Find gaps, set priorities and plan improvements.

System work still needed: Baseline system review, objectives and funded improvement plans.

Explore 3 supporting entries →

Z10 Alignment

7 · Support

Build competence, communicate and keep useful records.

System work still needed: Role competence, communication and document-control processes.

Explore 264 supporting entries →

Z10 Alignment

8 · Implementation & Operation

Put controls and safety programs into practice.

System work still needed: Employer-specific programs, control ownership and operating records.

Explore 272 supporting entries →

Z10 Alignment

9 · Evaluation & Corrective Action

Check performance, learn and verify improvements.

System work still needed: Monitoring, internal audit, corrective action and effectiveness reviews.

Explore 55 supporting entries →

Z10 Alignment

10 · Management Review

Use leadership review to improve the whole system.

System work still needed: At-least-annual management review, decisions and follow-up.

Explore 3 supporting entries →
Review all 30 clause groups and content gaps

These are counts of supporting resources. They do not prove that a requirement is fully covered or implemented. Detailed clause references appear on individual resources.

Clause groupAvailable entriesNot open for enrollmentContent-map status
4.1 · Organization and context113Supporting topics mapped; employer process still needed
4.2 · Workers and interested parties20Supporting topics mapped; employer process still needed
4.3 · System scope20Supporting topics mapped; employer process still needed
5.1 · Leadership, policy and accountability88Supporting topics mapped; employer process still needed
5.2 · Worker participation25414Supporting topics mapped; employer process still needed
5.3 · Management-system processes08Not open for enrollment; content gap remains
6.1 · Review process23Supporting topics mapped; employer process still needed
6.2 · Assessment and priorities35Supporting topics mapped; employer process still needed
6.3 · Objectives and targets20Supporting topics mapped; employer process still needed
6.4 · Implementation plans and resources20Supporting topics mapped; employer process still needed
7.1 · Resources06Not open for enrollment; content gap remains
7.2 · Education, training and competence105Supporting topics mapped; employer process still needed
7.3 · Awareness and communication24510Supporting topics mapped; employer process still needed
7.4 · Document control162Supporting topics mapped; employer process still needed
8.1 · Operational planning and control2417Supporting topics mapped; employer process still needed
8.2 · Identifying system issues24915Supporting topics mapped; employer process still needed
8.3 · Risk assessment22716Supporting topics mapped; employer process still needed
8.4 · Hierarchy of controls23616Supporting topics mapped; employer process still needed
8.5 · Design review and change2315Supporting topics mapped; employer process still needed
8.6 · Procurement00No direct resource mapped yet
8.7 · Contractors32Supporting topics mapped; employer process still needed
8.8 · Occupational health215Supporting topics mapped; employer process still needed
8.9 · Emergency preparedness56Supporting topics mapped; employer process still needed
9.1 · Monitoring and assessment1420Supporting topics mapped; employer process still needed
9.2 · Incident investigation255Guided investigation & learning workflow available; employer adoption and implementation evidence still needed
9.3 · Audits00No direct resource mapped yet
9.4 · Corrective actions182Supporting topics mapped; employer process still needed
9.5 · Feedback and organizational learning2614Supporting topics mapped; employer process still needed
10.1 · Management review process30Supporting topics mapped; employer process still needed
10.2 · Review outcomes and follow-up20Supporting topics mapped; employer process still needed

Find a resource for your system.

Search by work, topic, course or clause. Each result shows whether it is free without an account, free with an account, or a paid book or editable program package. Courses not open for enrollment are hidden until you choose to include them.

272 matching entries · Showing 97–120

Clear filters
JHA / JSA / AHAAvailable

Hollow Masonry Adhesive Anchor Installation JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Hot Asphalt Built-Up Roofing JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Hot Weather Concrete Acceptance and Evaporation Control JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Hydraulic Self Climbing Form Advancement JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Hydronic Foundation Ground Thawing JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Induction Attached PVC Roof Membrane JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Interior Light Gauge Metal Stud Framing JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Jobsite Table Saw Ripping JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Ladder Use JHA: Portable Access Example and Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

JHA / JSA / AHAAvailable

Listed Masonry Wall-to-Wall Firestop Joint Installation JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Load Bearing Cold Formed Steel Wall Erection JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Load Bearing Rubble Stone Wall Construction JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Localized Wood Roof Deck Replacement JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Low Slope Roof Tear Off JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Low-Voltage Roof Membrane Leak Detection JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Machine Assisted Concrete Slab Removal JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Magnetic Particle Structural Weld Examination JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Maintained Wet Cover Concrete Curing JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Manual Gliding Glass Door Roller Replacement JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Manual Masonry Brick Splitter Operation JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Manufactured Roof Expansion-Joint Bellows Installation JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Masonry Cell Reinforcement Installation JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Masonry Chemical Cleaning JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

JHA / JSA / AHAAvailable

Masonry Grout Pumping JHA: Worked Example & Free Template

Operate and verify controls. Worked task–hazard–control rows include field checks and changed-work prompts. This maps the analysis method; it is not a legal applicability decision.

Use it in your system

Employer evidence: Adapt the example to the actual workplace, consult workers, assign controls and retain dated field-verification records.

Supporting clauses: 8.1, 8.2.1, 8.3, 8.4, 8.5 · ANSI/ASSP Z10.0-2019

Connected resources

Program library

Build with safety program templates.

The current library contains 133 developed templates, including the master template. Standalone editable safety-program packages are $39.99 each, plus applicable tax, where available. Active Safety Management includes all developed templates; some are not sold separately. Bundles have their own listed prices. Additional policy and program topics below are labeled BETA test and are not available; this is not a complete list of every employer’s needs.

Open the safety program library →

BETA test · Not available · Policy

Safety and health policy

Leadership commitments, authorization, communication and review.

Planned Z10 references: 5.1.2

BETA test · Not available · Policy / process

Roles, accountability and worker participation

Responsibilities, authority, resources and ways for workers to participate.

Planned Z10 references: 5.1.3, 5.2

Template available · Safety program

Hazard Communication

Workplace chemical context, controls, information, training and required records.

Planned Z10 references: 7.2, 7.3, 8.1, 8.2.4, 8.8

Template available · Safety program

Lockout / Tagout

Equipment-specific arrangements, authorized roles and verification records.

Planned Z10 references: 7.2, 8.1, 8.4, 9.1

Template available · Safety program

Powered Industrial Trucks

Equipment, traffic interfaces, practical evaluation and inspection arrangements.

Planned Z10 references: 7.2, 8.1, 8.4, 9.1

Template available · Safety program

Fall Protection

Work-specific protection, competent roles, equipment checks and rescue planning.

Planned Z10 references: 7.2, 8.1, 8.4, 8.9

Template available · Safety program

Bloodborne Pathogens

Exposure context, controls, training and confidential health arrangements.

Planned Z10 references: 7.2, 8.1, 8.8

BETA test · Not available · Safety program

Occupational health and psychosocial risks

Work-related exposures and stressors, controls, worker input and evaluation.

Planned Z10 references: 5.2, 8.8, 9.1

From a resource to a working system.

  1. Understand the work. Confirm activities, people, locations and hazards.
  2. Choose and adapt. Use the relevant learning or tool with workers.
  3. Put it into practice. Assign responsibilities, implement controls and communicate.
  4. Keep and review evidence. Check actual work, address gaps and verify improvements.

Editorial alignment to ANSI/ASSP Z10.0-2019, prepared 2026-10-18. Independent technical review is pending. Z10 references identify supporting topics; they do not imply ASSP endorsement, legal compliance or certification. The full standard and its requirements are not reproduced here.